Home > News > Content

The Development History Of The Floating Bridge

   A bridge, a bridge that floats on a waterplane. The army used the standard pilots of the military pontoon, then called the bridge. The history of the pontoon is based on China. "The Book of Songs Daya Da Ming" records: "pro welcome to Wei, boat for the beam", recorded Zhou Wen Wang Ji Chang in 1184 years in the Weihe River pontoon. In foreign countries, the Persian empire of Cyrus in the 537 BC in Mesopotamia built pontoon. The pontoon can be used for people, roads, railways. Floating Bridge

  Its structure is not complicated, the demolition is also convenient, but the high cost of maintenance. Usually available for emergency relief or as a temporary transport facilities, wartime can be used to ensure that the military quickly through the river military standard boat bridge, in order to increase its mobility, commonly used light metal made of self.

    A bridge, a bridge that floats on a waterplane. The army used the standard pilots of the military pontoon, then called the bridge. The history of the pontoon is based on China. "The Book of Songs Daya Daming" records: "pro welcome to Wei, boat for the beam", recorded Zhou Wen Wang Ji Chang in 1184 years in the Weihe River pontoon. Eastern Han Guangwu Emperor Jianwu eleven years (AD 35 years), Gong Sun described in this Hubei Yidu, Yichang set up between the Yangtze River pontoon. The Western Jin Dynasty Emperor Tai Tai ten years (274 years), Du in this Henan Mengjin near the Yellow River set up the river pontoon, has been used for more than 800 years. In the foreign country, the Persian Empire of Cyrus in the 537 BC in Mesopotamia built pontoon; Zells I in 481 BC to enter Europe in Helles Pang (now Dardanier Strait) to build the pontoon to connect Europe, the subcontinent.Floating Bridge

   There are two types of pontoon structure: ① the traditional form is in the boat or pontoon on the beam, and then bridge the deck. (2) the form of a boat, or the vessel is connected to the end of the vessel, in a stringed manner, or the boat is closely arranged in a belt. In order to maintain the location of the pontoon axis is not offset, in the upstream and downstream cable anchor required. For the cross-strait connected, in the cross-strait need to set the transition beam or springboard. In order to meet the water level fluctuations, the two sides should also set up or down the bridge or lift the bridge.Floating Bridge